
GALLERY

ooo doesn't look good... This is a Magna Cleanse after 2 years of use, as you can see it collects all the gunge from your heating system and was cleaned as part of a heating issue we attended.

These electrodes sit inside your boiler and are checked on an annual full boiler service. These were corroded and replaced.

Unvented Cylinder Upgrade which can replace traditional cylinder and tanks


Nice tidy pipework on a boiler installation

Designer Column Radiator installation

Designer Radiator Installation

Installation of a new boiler within the Loft space.

Even the toughest walls are no match for DRH...

A new bathroom. Tiling completed by Mike, all plumbing by DRH

Basin and Vanity Unit installation - Lighting and electrics completed by Sage Electrical

Tiling by Mike Smith Tiling Plastering by Nick Taylor Plastering